Scaffolding System

Ringlock Scaffolding System | Modular Rosette Scaffold for Industrial & Commercial Use
The Ringlock scaffolding system (also called rosette scaffold or modular ring system) is the most advanced modular scaffolding technology available today. The unique rosette ring design allows up to 8 connections at a single node — 4 horizontals and 4 diagonals — enabling complex geometric configurations impossible with traditional tube-and-coupler systems.
Key advantages: 50% faster assembly than traditional scaffolding, fewer loose parts (no nuts, bolts, or wedges to lose), higher load capacity per connection point, and superior adaptability to complex structures. Manufactured from Q345 structural steel with hot-dip galvanized finish for maximum durability.
Ringlock System Components
| Component | Specification | Typical Sizes |
|---|---|---|
| Standard (Vertical) | OD 48.3mm × 3.25mm, rosettes at 500mm intervals | 0.5m, 1.0m, 1.3m, 1.5m, 1.8m, 2.0m, 2.5m, 3.0m |
| Ledger (Horizontal) | OD 48.3mm × 2.5mm, wedge connection | 0.5m–3.0m (custom) |
| Diagonal Brace | OD 42.7mm × 2.5mm | Per bay configuration |
| Base Jack / U-Head | Adjustable screw type | 0.5m–0.8m adjustment |
| Steel Plank / Deck | Galvanized steel with hooks | Width 240mm/320mm |
Material & Finish
| Property | Value |
|---|---|
| Steel Grade | Q345 (primary) / Q235 / Q255 |
| Tube Diameter | 48.3mm OD (standard) |
| Wall Thickness | 3.25mm (vertical standard) |
| Surface | Hot-Dip Galvanized (after fabrication) |
| Standards | EN74 / BS1139 / EN12810 / EN12811 |
| Certification | ISO 9001, SGS, BV Available |
Frequently Asked Questions About Ringlock Scaffolding System | Hot-dip Galvanized Modular Rosette Scaffold Q345
Q: What is the minimum order quantity for Ringlock Scaffolding System | Hot-dip...?
A: Standard MOQ is one 20ft container (approximately 25-28 tons). For trial orders, we can arrange LCL shipments starting from 1 ton with a small logistics premium. Contact us with your required specifications for a precise quotation.
Q: How long does delivery take for Ringlock Scaffolding System | Hot-dip...?
A: Production lead time is 15-25 days after deposit confirmation for standard orders. Large quantity orders (10+ containers): 25-35 days. Sea freight transit time varies by destination port — typically 20-45 days. Contact us with your destination for an estimated delivery schedule.
Q: Can I get samples of Ringlock Scaffolding System | Hot-dip... before placing a bulk order?
A: Yes. We provide free samples for existing stock items (you cover freight cost). For custom specifications, a sample fee applies which is fully deducted from your bulk order. Typical sample delivery: 3-5 working days after confirmation.
Related Guide: Ring Lock Scaffolding Complete Buyers Guide
Want to learn more about ring lock scaffolding specifications, international compliance (CIDB Malaysia, Kuwait MEW, EN12811), installation steps, container loading calculations, and country-specific import requirements? Read our comprehensive 3,000-word guide covering 8 export markets.
Read Full Guide »

