CE EN1090 & ISO 3834 Certified Manufacturer

Frame Scaffolding Systems

Walk-through A-frame and H-frame scaffolding for construction access. Main frame widths 762mm / 914mm / 1219mm with full component system — cross braces, metal decks, screw jacks, guardrails, ladders, and castor wheels. Q235/Q345 steel, painted or hot-dip galvanized. ISO 9001 & EN1090 certified factory-direct from Tianjin.

ISO 9001:2015 Certified EN1090 Structural Certified OD 42.7mm Tubes 4 Finish Options
Frame Scaffolding System — Sino East A-Frame Scaffold Frame Scaffolding Tower
🇵🇭 Philippines Top Market
🇹🇭 Thailand
🇮🇩 Indonesia
🇲🇾 Nigeria
🇪🇸 Kenya
🇨🇦 UAE & Middle East
🇳🇱 Malaysia

Frame Scaffolding System Components

A complete frame scaffolding system includes main frames, cross braces, joint pins, metal decks, guardrails, screw jacks, ladders, and accessories. All components work together for safe, fast assembly on construction sites.

Main Frame (A-Frame)

Walk-through A-frame with V-press connection. 762/914/1219mm widths.

OD 42.7mm

Cross Brace (X-Brace)

Diagonal bracing for lateral stability. Multiple sizes for all frame widths.

OD 19-25mm

Metal Deck / Catwalk

Anti-slip steel deck boards. 210/240/250mm widths with hooks.

Q235 Steel

Screw Jack Base

Adjustable solid base jack for height leveling. OD 30/32/35mm.

400-600mm

Guardrail System

Safety guardrails and posts for fall protection at working levels.

OD 42.7mm

Ladder Frame

Built-in ladder access frames with anti-slip rungs for safe climbing.

OD 42.7mm

Castor Wheel

Mobile tower wheels with locking brake. PU, rubber, or iron core.

6" / 8"

Joint Pin & C-Lock

Frame coupling pins and C-lock spring clips for connection.

OD 36mm Pin

Frame Scaffolding in Production & Use

Frame Scaffolding Product Specifications

All dimensions and specifications for our complete frame scaffolding product range. Tube: OD 42.7mm, wall thickness 1.8-2.5mm. Material: Q235/Q345 steel. Custom sizes available upon request.

Main Frame Scaffolding — 1219mm Width
CodeItemSize (W x H)Tube ODWall Thickness
SE-MF1219Main Frame 1930mm1219 x 1930mmOD 42.7mm1.8 - 2.5mm
SE-MF1217Main Frame 1700mm1219 x 1700mmOD 42.7mm1.8 - 2.5mm
SE-MF1215Main Frame 1530mm1219 x 1530mmOD 42.7mm1.8 - 2.5mm
Main Frame Scaffolding — 914mm Width
CodeItemSize (W x H)Tube ODWall Thickness
SE-MF0917Main Frame 1700mm914 x 1700mmOD 42.7mm1.8 - 2.5mm
SE-MF0919Main Frame 1930mm914 x 1930mmOD 42.7mm1.8 - 2.5mm
SE-MF0915Main Frame 1530mm914 x 1530mmOD 42.7mm1.8 - 2.5mm
Main Frame Scaffolding — 762mm Width
CodeItemSize (W x H)Tube ODWall Thickness
SE-MF0717Main Frame 1700mm762 x 1700mmOD 42.7mm1.8 - 2.5mm
End Frame Scaffolding — 1219mm Width
CodeItemSize (W x H)Tube ODWall Thickness
SE-EF1212End Frame 1219mm1219 x 1219mmOD 42.7mm1.8 - 2.5mm
SE-EF1209End Frame 914mm1219 x 914mmOD 42.7mm1.8 - 2.5mm
SE-EF1204End Frame 480mm1219 x 480mmOD 42.7mm1.8 - 2.5mm
End Frame Scaffolding — 914mm Width
CodeItemSize (W x H)Tube ODWall Thickness
SE-EF0912End Frame 1219mm914 x 1219mmOD 42.7mm1.8 - 2.5mm
SE-EF0909End Frame 914mm914 x 914mmOD 42.7mm1.8 - 2.5mm
SE-EF0904End Frame 480mm914 x 480mmOD 42.7mm1.8 - 2.5mm
Horizontal Frame Scaffolding
CodeItemSize (W x L)Tube ODWall Thickness
SE-HF1018Horizontal Frame1050 x 1829mmOD 42.7mm1.8 - 2.5mm
SE-HF0918Horizontal Frame914 x 1829mmOD 42.7mm1.8 - 2.5mm
Cantilever Frame Scaffolding
CodeItemSize (W x H)Tube ODWall Thickness
SE-CF1217Cantilever Frame1218 x 1700mmOD 42.7mm1.8 - 2.5mm
Cross Braces (X-Brace) — 1829mm Height Bay
CodeSize (A x B x C)WeightTube ODWall Thickness
SE-XB18121829 x 1219 x 2198mm4.0 KGOD 19-25mm1.2 - 2.0mm
SE-XB18091829 x 914 x 2045mm3.7 KGOD 19-25mm1.2 - 2.0mm
SE-XB18061829 x 610 x 1928mm3.5 KGOD 19-25mm1.2 - 2.0mm
SE-XB18021829 x 280 x 1850mm3.4 KGOD 19-25mm1.2 - 2.0mm
Cross Braces — 1524mm Height Bay
CodeSize (A x B x C)WeightTube ODWall Thickness
SE-XB15121524 x 1219 x 1952mm3.6 KGOD 19-25mm1.2 - 2.0mm
SE-XB15091524 x 914 x 1777mm3.3 KGOD 19-25mm1.2 - 2.0mm
SE-XB15061524 x 610 x 1642mm3.0 KGOD 19-25mm1.2 - 2.0mm
SE-XB15021524 x 280 x 1550mm2.8 KGOD 19-25mm1.2 - 2.0mm
Cross Braces — 1219mm & 914mm & 610mm Height Bay
CodeSize (A x B x C)WeightTube ODWall Thickness
SE-XB12121219 x 1219 x 1724mm3.2 KGOD 19-25mm1.2 - 2.0mm
SE-XB12091219 x 914 x 1524mm2.8 KGOD 19-25mm1.2 - 2.0mm
SE-XB12061219 x 610 x 1363mm2.5 KGOD 19-25mm1.2 - 2.0mm
SE-XB12021219 x 280 x 1251mm2.3 KGOD 19-25mm1.2 - 2.0mm
SE-XB0909914 x 914 x 1293mm2.4 KGOD 19-25mm1.2 - 2.0mm
SE-XB0906914 x 610 x 1099mm2.0 KGOD 19-25mm1.2 - 2.0mm
SE-XB0902914 x 280 x 956mm1.8 KGOD 19-25mm1.2 - 2.0mm
SE-XB0606610 x 610 x 863mm1.7 KGOD 19-25mm1.2 - 2.0mm
SE-XB0602610 x 280 x 671mm1.3 KGOD 19-25mm1.2 - 2.0mm
Solid Base Screw Jack
CodeItemSize (OD x H)Base Plate
SE-SJ3040Solid Jack Base 01OD 30 x 400mm120 - 200mm
SE-SJ3060Solid Jack Base 02OD 30 x 600mm120 - 200mm
SE-SJ3240Solid Jack Base 03OD 32 x 400mm120 - 200mm
SE-SJ3260Solid Jack Base 04OD 32 x 600mm120 - 200mm
SE-SJ3540Solid Jack Base 05OD 35 x 400mm120 - 200mm
SE-SJ3560Solid Jack Base 06OD 35 x 600mm120 - 200mm
U-Head Screw Jack
CodeItemSize (OD x H)U-Head Size
SE-UJ3040Adj U-Head Jack 0130 x 400mm120 - 200mm
SE-UJ3060Adj U-Head Jack 0230 x 600mm120 - 200mm
SE-UJ3240Adj U-Head Jack 0332 x 400mm120 - 200mm
SE-UJ3260Adj U-Head Jack 0432 x 600mm120 - 200mm
SE-UJ3540Adj U-Head Jack 0535 x 400mm120 - 200mm
SE-UJ3560Adj U-Head Jack 0635 x 600mm120 - 200mm
Vertical Shore Post
CodeItemAdjustable SizeWeightInner/Outer Tube
SE-VS40Vertical Shore Post 011210 - 2060mm10.0 KGOD 48.3 / 60.3mm
SE-VS50Vertical Shore Post 021520 - 2520mm11.5 KGOD 48.3 / 60.3mm
SE-VS60Vertical Shore Post 031860 - 3110mm12.9 KGOD 48.3 / 60.3mm
SE-VS70Vertical Shore Post 042165 - 3400mm13.8 KGOD 48.3 / 60.3mm
SE-VS90Vertical Shore Post 052755 - 4000mm15.2 KGOD 48.3 / 60.3mm
Metal Deck — 210mm Width
CodeItemLengthWidthHeight
SE-MD2110Metal Deck1000mm210mm45mm
SE-MD2115Metal Deck1500mm210mm45mm
SE-MD2120Metal Deck2000mm210mm45mm
SE-MD2125Metal Deck2500mm210mm45mm
SE-MD2130Metal Deck3000mm210mm45mm
Metal Deck — 240mm & 250mm Width
CodeItemLengthWidthHeight
SE-MD2410Metal Deck 240mm1000mm240mm45mm
SE-MD2420Metal Deck 240mm2000mm240mm45mm
SE-MD2430Metal Deck 240mm3000mm240mm45mm
SE-MD2510Metal Deck 250mm1000mm250mm40/50mm
SE-MD2520Metal Deck 250mm2000mm250mm40/50mm
SE-MD2530Metal Deck 250mm3000mm250mm40/50mm
Guard Rail
CodeItemSize AWeightTube OD
SE-GR066Guard Rail610mm0.6 KGOD 19-25mm
SE-GR077Guard Rail762mm0.8 KGOD 19-25mm
SE-GR099Guard Rail914mm0.9 KGOD 19-25mm
SE-GR121Guard Rail1219mm1.1 KGOD 19-25mm
SE-GR151Guard Rail1524mm1.5 KGOD 19-25mm
SE-GR181Guard Rail1829mm1.8 KGOD 19-25mm
Guardrail Post & Arm Lock
CodeItemSizeTube ODWall Thickness
SE-GRP121Guardrail Post1219mmOD 42.7mm1.8 - 2.5mm
SE-AL03Arm Lock 01331.5mm0.4 KG
SE-AL04Arm Lock 02419.0mm0.5 KG
SE-AL05Arm Lock 03507.5mm0.6 KG
SE-AL06Arm Lock 04739.0mm0.8 KG
SE-AL07Arm Lock 05826.0mm0.9 KG
Castor Wheels for Mobile Tower
CodeItemSizeMaterialWeight
SE-CW081PU Castor8"PU5.5 KG
SE-CW082Rubber Castor8"Rubber5.5 KG
SE-CW083Iron Core Castor8"Iron Core5.5 KG
SE-CW061PU Castor6"PU4.5 KG
SE-CW062Rubber Castor6"Rubber4.5 KG
SE-CW063Iron Core Castor6"Iron Core4.5 KG
Other Accessories
CodeItemSize / SpecWeight
SE-WJ50Wall Joint575 - 770mm1.0 KG
SE-JP01Scaffold Joint PinOD 36 x 225mm0.3 - 0.6 KG
SE-ST1817Scaffolding Stair1725 x 1829mm45 KG
Catwalk Board
CodeItemSize (W x L)
SE-CB5018Catwalk Board500 x 1829mm
SE-CB4818Catwalk Board480 x 1829mm
SE-CB4518Catwalk Board450 x 1829mm
SE-CB4218Catwalk Board420 x 1829mm
SE-CB5012Catwalk Board500 x 1219mm
SE-CB4812Catwalk Board480 x 1219mm
SE-CB4512Catwalk Board450 x 1219mm

Frame Scaffolding Components in Detail

A-Frame Main Frame Scaffolding

A-Frame (Main Frame)

Walk-through design for easy worker passage. V-press connection system for quick assembly. Three widths and three heights available.

C-Lock Frame Accessory

C-Lock Spring Clip

Secures cross braces to frame lugs. Spring steel with galvanized finish. Quick connect/disconnect for efficient assembly.

Frame Scaffolding with Guardrail

Guardrail System

Complete fall protection with guardrail posts and horizontal rails. Meets safety standards for working at height.

Metal Deck / Steel Plank

Metal Deck Platform

Anti-slip steel deck boards with hook ends. 210mm, 240mm, and 250mm widths. Hot-dip galvanized for durability.

Scaffolding Ladder Frame

Ladder Frame

Built-in ladder access with anti-slip rungs. Safe multi-level climbing integrated directly into the frame structure.

Frame Scaffolding Components Detail

Complete Accessory Range

Joint pins, arm locks, wall joints, castor wheels, stairs — every component for a complete frame scaffolding system.

Why Our Frame Scaffolding Is the Right Choice

20+ years manufacturing experience. 50,000 m² production facility. Exporting to 50+ countries worldwide.

01

Four Surface Finish Options

Pre-galvanized, painted, powder coated, or hot-dip galvanized. Choose the right corrosion protection for your climate and budget.

02

Q235 / Q345 Steel Options

Standard Q235 for general construction or high-strength Q345 for heavy-duty applications. Wall thickness 1.8-2.5mm.

03

Fast V-Press Connection

V-press joint system ensures tight, secure frame connections without bolts. Dramatically faster assembly than tube & clamp systems.

04

Complete One-Stop Supply

Frames, braces, decks, jacks, guardrails, ladders, castors — everything from one factory. No need to source components separately.

05

Container-Optimized Loading

Frames are designed for efficient container packing. Maximum tonnage per container reduces your per-unit shipping cost.

06

Custom Branding Available

Emboss your company logo, product codes, and tracking numbers on frames and components. Build your own product identity.

Ordering Frame Scaffolding — Simple 4-Step Process

1

Send Your Requirements

Tell us the frame sizes, quantities, surface finish, and destination port. Our engineering team reviews within 24 hours.

2

Receive Quotation & Drawings

We provide detailed pricing, technical drawings, and a container loading plan. Free quantity estimate from your project plans.

3

Production & Inspection

15-25 day production with in-process QC checks. Mill test certificates and third-party SGS/BV inspection before shipment.

4

Shipping & Delivery

Container loading at Tianjin port. Door-to-door delivery available. Full export documentation provided.

Certified Frame Scaffolding Manufacturing

Every frame scaffolding component is manufactured to international quality standards with full traceability.

CE

EN1090-1

European structural certification

ISO

ISO 3834-2

Welding quality requirements

9001

ISO 9001

Quality management system

Load Tested

Capacity verified in-house

Frame Scaffolding — Frequently Asked Questions

What is the difference between A-frame and H-frame scaffolding?
An A-frame (main frame) has a walk-through opening shaped like an 'A', allowing workers to pass through easily. An H-frame has horizontal cross bars forming an 'H' shape for extra rigidity. Both are welded tubular frame systems using Q235/Q345 steel tubes (OD 42.7mm). Main frames typically come in 914mm and 1219mm widths with heights of 1530mm, 1700mm, and 1930mm.
What surface finishes are available for frame scaffolding?
Frame scaffolding is available in four surface finishes: pre-galvanized (zinc-coated tube before welding), painted (red/blue/yellow primer paint, most economical), powder coated (durable colored finish), and hot-dip galvanized (thick zinc coating after welding for maximum corrosion resistance, ideal for coastal and humid environments).
What sizes are available for main frame scaffolding?
Main frame scaffolding is available in three widths: 762mm (2.5ft), 914mm (3ft), and 1219mm (4ft). Heights: 1530mm, 1700mm, and 1930mm. Tube diameter is OD 42.7mm with wall thickness ranging from 1.8mm to 2.5mm depending on load requirements. Custom sizes are available upon request.
What components are included in a frame scaffolding system?
A complete frame scaffolding system includes: A-frames (main frames) or H-frames, cross braces (X-braces), joint pins (coupling pins), C-locks or arm locks for securing braces, base plates or screw jacks, metal decks/catwalk boards, guardrails and guardrail posts, ladders or ladder frames, and optionally caster wheels for mobile towers.
What standards does your frame scaffolding meet?
Frame scaffolding is manufactured to BS1139 and EN12810 standards. Our factory is ISO 9001:2015 certified with EN1090 structural certification and ISO 3834-2 welding quality certification. Mill test certificates (EN 10204 Type 3.1) are provided with every shipment. Third-party inspection by SGS/BV is available.
What is the minimum order quantity and delivery time?
Standard MOQ is one 20ft container (22-28 tons depending on product mix). Trial orders from 1 ton available via LCL. Production time is 15-25 days after deposit. Sea freight is 20-45 days depending on destination. Total door-to-port delivery is typically 6-10 weeks. Mixed container loads are supported — you can combine frames, braces, decks, and accessories in one shipment.

Get Your Frame Scaffolding Quotation Today

Tell us your frame sizes, quantities, and preferred surface finish. Our engineering team provides a tailored solution with a competitive quote within 24 hours.

WhatsApp Inquiry ➔ Email Us ✉

Related Scaffolding Products