Categories
Contact us
Hi Load 60 Ring Shore
Hi Load 60 Ring Shore Scaffolding System — Heavy-duty 60mm ring-lock shoring system designed for extreme load-bearing applications in bridge, tunnel, and high-rise construction
ISO 9001 certified | Hot-dip galvanized | BS1139/EN standards | Container loading optimized | MOQ 1 container | Factory-direct from Tianjin, China
Hi Load 60 Ring Shore scaffolding is manufactured by SINO EAST STEEL GROUP at our ISO 9001 certified 80,000 m² factory in Tianjin, China. Heavy-duty 60mm ring-lock shoring system designed for extreme load-bearing applications in bridge, tunnel, and high-rise construction We export to 50+ countries worldwide with full documentation support including mill test certificates, compliance certificates, and third-party inspection.
Technical Specifications
| Property | Specification |
|---|---|
| Standard | OD 60.3mm × WT 4.0mm, heavy-duty rosette |
| Ledger | OD 48.3mm × WT 3.5mm |
| Diagonal Brace | OD 48.3mm × WT 3.0mm |
| Rosette | 12mm thick forged, 8 slots |
| Surface | Hot-dip galvanized 85μm |
| Steel Grade | Q355/Q420 |
| Load Capacity | 60–100kN per leg |
| Load Class | 5–6 (EN12811) |
| Best Use | Bridge falsework, tunnel support, heavy shoring |
Get Hi Load 60 Ring Shore Scaffolding Factory Price
Contact us for a detailed quotation with FOB/CIF pricing, production timeline, and container loading plan. We reply within 24 hours.
Send Inquiry → WhatsApp +86-18622088833Frequently Asked Questions
Q: What is the minimum order quantity for Hi Load 60 Ring Shore scaffolding?
A: Standard MOQ is one 20ft container (22–28 tons depending on component mix). Trial orders from 1 ton available via LCL. Contact us for a mixed-container quotation tailored to your project.
Q: What standards does your Hi Load 60 Ring Shore system comply with?
A: ISO 9001:2015 factory certification. Products manufactured to EN12810/EN12811/BS1139 standards as applicable. Mill test certificates (EN 10204 Type 3.1) provided with every shipment. SGS/BV/TUV third-party inspection available.
Q: What is the typical delivery time?
A: Production 15–30 days after deposit confirmation. Sea freight 20–45 days depending on destination port. Total door-to-port: typically 6–10 weeks. Rush production available for time-critical projects.